Digital Bomb Calorimeter BCM-P
Bomb Calorimeter is used to determine Gross Calorific Value of Sold and Liquid combustible fuel. Suitable for low budget industrial organization, universities for educational purposes.
Manual operation with Iso thermal principle, gives result of GCV of respective solid liquid fuels.
Our latest design of easy to use Gas Filling System greatly reduces of damage to the costly Gas Filling Tubes with our latest design of Stainless Steel braided PTFE Hose. Our tests have indicated that this new Gas Filling System reduces the time taken for Oxygen charging from around 10-13 minutes (using the copper tube) to less than 3 minutes (using the new Gas Filling System) while simultaneously avoiding chances of cross-threading & subsequent damage to the Gas Filling System.
Each Advance Calorimeter Bomb is tested thoroughly before it leaves the factory at internal pressure of 300kg/cm2 for a period of 10 minutes without any sign of leakage in accordance with requirements of the Institute of Petroleum (I.P. 12/58T, Appendix I), IS:1350 (Part-II) 1970 and works Test certificate issued with each Bomb.
| Model | BCM-P |
| Operational Principle | Isothermal |
| Fundamental Standards | BIS-1350 (Part-2), IP-12/63T |
| Inner Vessel | Electroplated Copper |
| Outer Jacket | Electroplated Copper & water Filled/Puff Insulation (Optional) |
| Bomb Design | schrader Valve |
| Bomb & Bucket | Removable |
| Oxygen Filling | Manual |
| Sensor | Single Sensor |
| Temperature Accuracy | 0.01 deg C |
| R.S.D | 1-1.5% with Benzoic Acid |
| Range | 1000-8,000 Cal/g |
| Display | Digital Temperature with Time |
| Printer Facility (Temp Vs Time) | Available |
| Stirrer | Compact 12V DC |
| Bomb Firing | Manual |
| Calculation | Manual |
| Testing Time | 12-15 Minutes approx. |
| Operating Temperature | 15-30 deg C |
| Weight | 30 Kg approx. |
| Power Input & Requirement | <1.0KW, 230V+10V, 50 Hz |
- By using spicke correction capable of measuring of low value and by reducing weight of sample can measure higher value .
Note: Due to process of continuous improvements, specifications are subject to change without prior notice
